top of page

Case Study

Montessori School

logo_rejuwater_stp.png

STP

Site location:

Anantpur

Project type:

EDU

Capacity (KLD):

100

Built up area (m²):

200

Built up volume (m³):

100

Construction period (days):

15

Start of operation:

2018

PROJECT BACKGROUND

SYSTEM IN BRIEF

The wastewater streams are collected in a baffled raw sewage collection tank from where it is pumped to an overhead Buffer Tank for providing a constant gravity flow of raw sewage feed to the rejuWATER® modules. The outlet (treated water) from the bottom of the modules is then used directly or polished further, depending on the use case.

PURPOSE

  • Compliance with State Pollution Control Board standards

  • To treat large quantity of wastewater generated

  • To supplement the water requirements

drg_ga_bf.jpeg

OPERATION & MAINTENANCE

The wastewater treatment plant is operated and maintained by the trained gardener of the premises. A regular daily schedule is followed for maintenance, like checking of sewer line systems, removal of sludge from modules (if any) and regular harvesting of plants. 

Cost incurred per month for operation and maintenance is approximately ₹25,000/-

REUSE OPTIONS

  • Influent quality : BOD: 300 to 600 mg/L, COD: 600 to 800 mg/L.

  • Reuse of treated water for gardening and horticulture.

  • Sludge can be transformed into good manure through composting.

PROJECT PHOTO/VIDEO

bottom of page